Background

Set out in the table below is the Statement of Operations for Specialized Transit Services for the eight-month period ending August 31, 2025. The statement sets out actual to budget performance for the period.

London Transit Commission Statement of Operations – Specialized Transit Services Eight Months Ending August 31, 2025 (000’s omitted)

Description  Actual  Budget Amount Better (Worse) Percent Better (Worse)
Revenue
Transportation $ 565.8 $ 623.0 $ (57.2)  (9.2)%
City of London 9,732.0 9,732.0 0.0 %
Total revenue 10,297.8 10,355.0 (57.2)  (0.6)%
Expenditure
Personnel cost 963.5 1,018.3 54.8  5.4 %
Contract service cost 9,067.1 9,205.8 138.7 1.5 %
All other material expense 130.3 130.9 0.6 0.4 %
Total expenditure 10,161.0 10,355.0 194.0  1.9 %
Net favourable/(unfavourable) $ 136.9  $ – $ 136.9  1.3 %

As indicated in the above table, the service has a net favourable operating budget performance to date of 1.3% or $136,900. An explanation of the variances is set out below.

Net Operating Costs

  • unfavourable transportation revenue of $57,200 due to lower ridership than budgeted;
  • favourable personnel costs of $54,800 due to timing of vacancies and less than anticipated overtime; and
  • favourable contract service costs of $138,700 mainly due to penalties applied to the service provider in Q1 for not achieving predetermined daily service levels, noting these favourable service hours are being reapplied to off peak hours during the remainder of the year.

Ridership

The following table sets out actual to budget ridership and other performance related measures as well as a comparison to the same period in the previous year.

Ridership and Other Statistics Actual vs. Budget Eight Months Ending August 31, 2025 (000’s omitted)

Description Actual Budget Variance % Variance 2024 Actual % Variance
Eligible passenger trips 206,384 227,900 (21,516) (9.4)% 184,834 11.7 %
Attendant/companion trips 23,669 23,700 (31) (0.1)% 19,657 20.4 %
Total Trips 230,053 251,600 (21,547) (8.6)% 204,491 12.5 %
Average fare  $ 2.460 $ 2.476  $ (0.017) (0.7)%  $ 2.477  (0.7)%
Service Hours 125,837 125,900 (63) (0.1)% 110,720 13.7 %
Total trips per service hour 1.83 2.00 (0.17) (8.5)% 1.85 (1.0)%

As indicated in the table above, total trips were 21,547 rides less than budget. This variance is primarily the result of rides per service hour being less than budget (21,432 trips) and fewer service hours than budgeted being provided (116 trips).

The unfavourable variance in trips per service hour is largely due to the impacts of the implementation of the new scheduling software over the first few months of the year. Service efficiency was not at expected levels in the early months as administration worked with the vendor to adjust system parameters. In addition, the new scheduling software utilizes actual drive time calculations when scheduling trips, which takes into account the travel time impacts of construction related detours, etc.

Administration will continue to monitor the operating budget performance reporting on same monthly, including providing recommendations as may be appropriate.

Recommended by:

Mike Gregor, Director of Finance

Concurred in by:

Kelly S. Paleczny, General Manager